Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk /Q(J ~ ~O/Z~ C1J~'r~tvlrlrE`~ <br />NPDES ID. No.: None <br />Inspection Period: First Quarter2D05 <br />Inspection Date; 03/17/05 <br />General Descrip~ti[on or Refere-ngce to Site Plan: ~J /~ /' <br />~L1 S LJ+'~ l'^~ v\ WW-~-tJ~ {(~iceSf vl IS /VICI ~Z ec.C fz~.c ~~~`C~ °' - <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent~ader~le Few Poor <br />Extensive Sorne lC~ None <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />MSHA Qualified Impoundme Inspector <br />3 /-705 <br />Date <br />l/ e~ /'!~,~/~ <br />„~,,, <br />a~ <br />Clf o 1 <br />N o t-~ <br />No (i <br />No v <br />r~ <br />