My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30633
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:18 PM
Creation date
11/21/2007 12:39:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Hydrology
Doc Date
7/9/1991
Doc Name
RATIONALE FOR PUBLIC NOTICE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT HEALTH, Water Quality Contro~ivision <br />Permit Number CO-0032751 Page 10. <br />G. Additional Monitorine: Instream Flow Measurements and Total Hardness <br />Monitorin¢ <br />These instream monitoring requirements were added in order to verify the <br />assumptions made for determining the limitations of this permit. This <br />includes installing a flow measuring device in Coon Track Creek above the <br />Caribou Mine discharge and monitoring for Total Hardness (as CaC03) in <br />Coon Track Creek at a point below the Cross Mine discharge. As indicated <br />in Part I.B.12 of the permit, the pexmittee shall work with the Division <br />in defining these two monitoring locations before they are established, <br />and the final locations shall be subsiitted to the Division in a facility <br />diagram. <br />Total Hardness shall be monitored on a monthly basis for at least one <br />year. The instream flows shall be monitored routinely on a weekly basis, <br />preferably during non-stormwater event periods, but at least 16 hours <br />after any rainfall events. <br />In addition, the annual low instream flow shall be determined one time <br />during December, as based upon several measurements of daily flow taken <br />during the week. The individual details of this one-time annual low flow <br />determination will need to be established with the Division prior to this <br />study being initiated. <br />H. Specific Compliance Recuirements <br />The following are specific compliance. items which require permittee action: <br />Office Permit <br />Code Event Citation Due Date <br />90508 Materials Containment Part I.E.1 90 days after <br />Plan Update effective date <br />34599 WET Testing Report - Acute Part I.B.3 Quarterly <br />WET Testing Report - Chronic Part I.B.10 Semiannually <br />Refer to permit <br />sections for the <br />due dates. <br /> <br />Don Holmer <br />November 25, 1988 <br />Updated and Revised June 11, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.