Laserfiche WebLink
<br />• <br />Reclamation will consist of revegetation with non-irrigated grasses of 45+ acres and construction <br />of a permanent private road of 2+ acres. This will involve the following reclamation phases. <br />Phase 1 - 15f acres of the Phase 1 Mining area, excluding the Plant Site azea and <br />• the permanent future private road azea along the east boundary of the <br />permit area. <br />• <br />Phase 2 - 9.Sf acres of the Phase 2 Mining azea, excluding the permanent future <br />private road azea along the east boundary of the permit area. <br />Phase 3 - 9.5± acres of the Phase 3 Mining azea, excluding the permanent future <br />private road area along the east boundary of the permit azea. <br />Phase 4 - 9.5± acres of the Phase 4 Mining area, excluding the permanent future <br />• private road azea along the east boundary of the permit azea. <br />Phase 5 - 2± acre Plant Site azea, which will be located in the northwest corner of <br />permit azea in the Phase 1 Mining azea. <br />• Reclamation will be undertaken in the following manner for each phase: <br />1. Except for the area of the permanent private road azeas, utilize any stored <br />overburden material and sand spoils from the plant's operation to level and regrade <br />disturbed areas, including areas where surface material and overburden may have <br />• been stored, to minimum 2% and maximum of 3H (horizontal) to IV (vettical) <br />slopes. <br />• <br />2. Rip and scarify any compacted areas, except the azea of the permanent private <br />road. <br />3. Respread available surface material for revegetation. <br />4. Revegetate per the accompanying recommendations in EXHIBIT I/l. <br />• With Phase 5 revegetation, the operator shall also revegetate all azeas of Phases 1 thru 4 where <br />revegetation was not previously successful. The operator shall to revegetate one other time, 1 year <br />after Phase 5 revegetation, any azeas where revegetation is still not successful. However, given <br />the sparseness of existing vegetation and the unsuitability of soil conditions for revegetation, proof <br />of this final revegetation activity will be deemed completion of reclamation activities. <br />• <br />The map on the next map "Exhibit F -Reclamation Map" shows the reclamation plan graphically. <br />1 <br />• <br />