My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30625
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:18 PM
Creation date
11/21/2007 12:38:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
10/4/1993
Doc Name
QTRLY SEDIMENTATION POND INSPECTIONS SENECA II-W MINE
From
PEABODY WESTERN COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION PORN <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Tom Wainwright DATE: 09/21/93 <br />NPDES I.D. NO.: CO-0000221 D.P. 006 <br />FACILITY CONFIGURATION: Cross-Valley Pond DATE LAST INSPECTION: 06/10/93 <br />SITE NAME: Pond X006 LOCATION: NW7~ NW1r, Sec. 22, TSN, R88W <br />MINE NAME: Seneca II-W Mine (Peabody Coal Co.1 LOCATION: 8 mi. S of Hayden, CO <br />MINE I.D. NO.: CMLRD Permit No. C-82-057 OWNER'S REP.: Scott Williams, Supt. <br />Circle or write in aooropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: _~ No <br />2. Lift thickness: 12 in. <br />3. Compaction according to approved plan: es No <br />4. Burning (specify extent and location): Yea <br />5. Angle of elope: 3.1 upstream, 3.1 downstream Total = 6.1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: Yee No <br /> At isolated points on embankment elopes: Yee <br /> At natural hillside: Yee <br /> Over widespread areas: Yee <br /> From downstream foundation area: Yee <br /> "Boils" beneath stream or ponded water: Yee <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19 <br />20 <br />Cracks or ecarpe on treat: <br />Cracks or ecarpe on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />*Eroeion of toe: <br />*Water impounded against toe: <br />Existing embankment freeboard: <br />Increase X Decrease in water level: <br />Cracks, bulging, or erosion on upstream face: <br />Visible sumps or sinkholes in slurry surface: <br />*Clogging <br />Spillway channels and pipes: <br />Decant system: <br />Diversion ditches: <br />*Cracking or crushing of pipes <br />Spillway pipes: <br />Decant system: <br />Trash racks clear and in place: <br />Yee <br />ee No <br />Yes <br />Yee <br />Yee No <br />Yee ®o <br />Yee <br />14.8 feet <br />4.7 feet <br />No <br />Yee No <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />~~N///A~7~ <br />`tif.:i <br />Yes CLo~ N/A <br />Yee o ~1 <br />Yee No I~ <br />Yee ~ N A <br />Yee No <br />es No N/A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted <br />in these items should normally be described (extent, location, volume, etc.) in the space on <br />the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.