My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE73259
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE73259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:53 PM
Creation date
11/21/2007 12:38:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006016
IBM Index Class Name
Permit File
Doc Date
4/28/2006
Doc Name
Adequacy Issues
From
DMG whe
To
Geological Services
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 04/27/2006 <br />User : WHE <br />State :Colorado <br />County :Dolores <br />Site :Perkins Sandstone <br />Agency or organization name :DMG <br />Permit or other job action :112c application review <br />Task description :Replace topsoil 1' <br />HOURLY EQUIPMENT COST <br />over 4 acres affected area <br />PermiUjob# : M-2006-016 <br />Abbreviation :none <br />Filename : MO16-005 <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $53.92 NA <br />Operating cosUhour : $75.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $161.74 Total fleet cosUhour : $161.74 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 LCY factor : NA volume : 6,453 LCY <br />Source of estimated volume : (4ac)(43560st/ac)(1'D)/27 = 6453.3 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job~Condition Correction Factors ~ Source <br />i <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomoosed rock - 25% Rock, <br />JOB TIME AND COST <br />Fleet size <br />0.00 % (pos) <br />7,650 feet <br />2,650 Ibs/LCY <br />75% Earth <br />1 Dozers) <br />8SU Horsepower: 310 <br />Shift basis : 1 per day <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 368.38 LCY/hr <br />Adjusted fleet production : 368.38 LCY/hr <br />Total job time : 17.52 Hours <br />Unit cost : $0.439 /LCY Total job cost : $2,833 <br />
The URL can be used to link to this page
Your browser does not support the video tag.