My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE73259
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE73259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:53 PM
Creation date
11/21/2007 12:38:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006016
IBM Index Class Name
Permit File
Doc Date
4/28/2006
Doc Name
Adequacy Issues
From
DMG whe
To
Geological Services
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br /> <br />001 -Demolish and remove mine related structures demolish ~ 1 4.0 $349 <br />002 ~ -Scale highwall for loose rock excavate 1 3.6Y $399 <br /> <br />003 -Place riprap spill-down at SW drainage excavate 1 1.3 $144 <br /> <br />004 -Rip $ grade 3 acres dozer 1 8.8 $1,473 <br /> <br />005 -Replace topsoil 1' depth over 4 acres affected area dozer 1 17.5 $2, 833 <br /> <br />006 -Revegetate 5 acres affected land revege 1 8.0 $2,674 <br /> <br />007 -Haul reclamation equipment to and from job site mobilize 4 5.3 $2,260 <br /> <br />008 -Construct 1000 feet of safety fence at $2.38/In.ft. NA 1 16.0 $2,380 <br />• Inclutles inFlation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />• assume net hours = 50% of (ask hours <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY- <br /> <br />2.02 <br />1.05 <br />32.37 <br />10.00 <br />NA <br />5.00 <br />NA" <br />SUBTOTALS: 64,) <br />TOTAL DIRECT COST • <br />% of direct total = $253 <br />_ <br />% of direct total = $131 <br />_ <br />hrs`...$/hr: $39.38 total = $1,275 <br />of direct total = $1,251 <br /> TOTAL 0 & P = $2, 910 <br />CONTRACT AMOUNT (direct+O&P)= $15,422 <br /> total = <br />_ <br />NA NA total = NA <br />of cntr. NA total = $771 <br />NA total = NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST= $3,681 <br />TOTAL BOND AMOUNT (direct+indirect) _ $16,193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.