Laserfiche WebLink
- sheet 2 of 2 <br />KVXUHOLC C4lU lrmo~ i <br />Machine Total <br />Description CosUhour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Costihrlfleel <br />-Flatbed Truck, 4x2, 30K GVW $47.10 1 $47.10 $47.10 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.10 $47.10 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Dolores <br />Transborlation Cvcle Time : Non- Total one-way travel distance : 25.0 <br />Roadable I Roadable Average travel speed : 30.0 <br />Haul time (hours) = 0.83 0.83 Total non-roadable mob/demob cost' <br />Return time (hours) = 0.83 0.83 'two round trips with haul rig <br />" <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 2.67 1.67 <br /> Total job time <br />JOB TIME AND COST <br /> Total job cost <br />miles <br />mph <br />~r <br />~~- <br />j _, <br />