Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Quarter: First 2007 <br />Inspection Date: 06-A r-07 <br />Identification <br />of Pond <br />s During Inspection: <br />aimate Water Level <br />lent (% total storage) <br />w (cfs) <br />Problem I Problem <br />Rills & Gulleys No No <br />Inadequate Vegetation No No <br />Outlel Channel Erosion No No <br />Burrows No No <br />Other No No <br />Differential Settling No No <br />Cracks or Slides No No <br />Seepage No No <br />Other No No <br />purtenant Structures <br />Defective Spillways No No <br />Dewatering Devices Clogged No No <br />Faulty Gates, Etc. No No <br />Comments Water level in Pond B was 6" below the level of the primary spillway. Pond A was dry. <br />nance Required: None <br />~~,@ ~BV®'~ <br />Controls: The oulslopes of the two sediment ponds were inspected®G~ ~®~91~tyq~ogqted. <br />0 <br />Oven °i ~ I O~, r°®® <br />oC^ ~L~c <br />~ a <br />,A ee ~-j~ j~~,~~~. <br />e „o ~or® <br />J. r ~- <br />''pp °c°c °°°°.\j A <br />Colo°ad~'Pp~.~1a92~C1a o~ate <br />®oapCEj_ <br />Hone ood Coal Com an <br />Hamilton Mine - C-91-078 <br />