Laserfiche WebLink
,: <br />• Contours on drawing are not labeled <br />• No scale on drawing <br />• No such pond as 76 <br />Pond 8 <br />• Elevation contours are not legible <br />• Observations regarding spillway sizing and construction are absent <br />• No scale <br />• No sediment storage <br />• No such pond as 8a <br />Pond 9a <br />• No scale <br />• Observations regarding spillway sizing and construction are absent <br />• Elevations contours are not legible <br />• No sediment storage stated <br />Pond 10a <br />• Pond is 10a not 10 <br />• Observations regarding spillway sizing and construction are absent <br />• No sediment storage or total storage stated <br />Pond 9 <br />• No sediment storage stated <br />• Observations regarding spillway sizing and construction are absent <br />• Combined embankment slope is steeper than 5:1 <br />Please review these comments and make the necessary changes or corrections and re-submit <br />each as-built certification to the Division within the next 60 days. If you have any questions, <br />please call me. <br />Since ly, <br />Ken Gorham <br />Environmental Protection Specialist II <br />cc: Mike Kolin, Greystone <br />