Laserfiche WebLink
i'YPA. OR PRIi~IT CLEARLY <br />14. Present land use r, ~ .~-~~ <br />(i.e., agricultural, industrial, etc.) ~~ ~ ~ ~-`- /~ <br />15. Proposed future land use aCtt(/-ZLLQ_L~ <br />(Goal of reclamation) <br />INSTRUCTIONS: This application form must be submitted in duplicate end each form must <br />ba accompanied by the following information and Items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 {for Special 10-day) for additional guidance. <br />EXHIBIT A - Leval Description <br />The legal description must identify•the affected land and be wholly adequate for <br />field location of tha property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. I•There applicable, the street address or lot <br />nirnber(s) may be used. <br />EXHIBIT B - ~•itning Plan <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />EXHIBIT C - 1•cao <br />This nap should be as comprehensive as possible in terns of clearly defining <br />the permit boundazies sad indicating all roads or stoclcpile areas to be u$ed in <br />connection with the operation. All immediately adjacent landowners must be shove. <br />The closest quarter section cornar, section line, or any other locateable point <br />should also'be shown on the map. . <br />EXHIBIT D - Wildlife, water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined in the <br />applicable Rule, under item number tea (10). <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If pat, the rarrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. _ <br />EXHIBIT G - Source of Leval Right to Enter <br />1"h1s could he a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notary public thaC ~ - <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECLaI. 10-IIAY PERt4ITS O:i..Y** <br />EXHIBIT A - Reclamation Costs <br />If the suretyis requested to be less than $2500, the operator must submit <br />facts to•support such request. Otherwise a surety of $2500 will automatically <br />• be set. <br />h^O:IIBIT I - T~t3is of Governmental•Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it vas required. <br /> <br />