Laserfiche WebLink
• <br />• <br />• <br />OXBOW CARBON & MINERALS <br />POND E SUMMARY <br />Runoff <br />Runoff Volume (10-year, 24-hour) 0.81 ac-ft <br />Active Pond Storage 0.38 ac-ft <br />Sediment <br />3 Yeaz Sediment Yield 0.93 ac-ft <br />Pond Sediment Storage 0.93 ac-ft <br />Sediment Storage Elevation 6,027.0 fr <br />Primary Spillway <br />Type 8 Inch Pipe <br />Invert Elevation 6,027.5 ft <br />Emergency Spillway <br />Type Broad Crested Weir <br />Bottom Width 15.0 ft <br />Invert Elevation 6,029.5 ft <br />Peak Discharge <br />10-year, 24-hour Event <br />Peak Dischazge In (10-year, 24-hour) 16.0 cfs <br />Peak Dischazge Out (10-yeaz, 24-hour) 1.8 cfs <br />Peak Elevation 6,029.4 ft <br />Peak Settleable Conc. 0.02 ml/1 <br />25-year, 24-hour Event <br />Peak Discharge In (25-year, 24-hour) 21.1 cfs <br />Peak Discharge Our (25-yeaz, 24-hour} 9.2 cfs <br />Peak Elevation 6,029.7 ft <br />Top of Dam 6,031.0 ft <br />Freeboard 1.3 ft <br />Depth of Flow 0.2 ft <br />TR-43 Revised September 2003 <br />