My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30573
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:16 PM
Creation date
11/21/2007 12:35:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Hydrology
Doc Date
10/6/1983
Doc Name
CONSTRUCTION OF WIERS AT NO THOMPSON CREEK MINE PERMIT C-025-81
From
MLRD
To
SNOWMASS COAL CO
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />~ III IIIIIIIIIIIIIIII <br />DEPARTMENTOFNATURALRESOURCES <br />David H. Getches, Executive Director <br />M1NED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />fllGM1d.tl 0 Lamm <br />Governor <br />October 6, 1983 <br />Mr. Scott Jones <br />Snowmass Coal Co. <br />P.O. Box 980 <br />Carbondale, Colorado 81623 <br />Re: Construction of Wiers at No. Thompson Creek Mine <br />Permit C-025-81 <br />Dear Mr. Jones: <br />__ _ .~ .~~ <br />In a letter dated September 23, 1983 you indicated that the D.O.W. <br />conditioned your 401 Permit (WQCD) to not allow construction activities <br />in Middle Thompson Creek after October 10, 1983. This would prevent you <br />from constructing the water monitoring weirs. You therefore requested an <br />extension of the completion deadline until October, 1984. <br />`I contacted Jim Goodyear of the D.O.W, who conducted the review of your <br />application. He has agreed to grant you an extension to complete the <br />weirs under several conditions. These conditions, listed below, will be <br />included as a compliance item in our inspection report: <br />1. The construction of the weirs Inay continue to October 14, 1983. <br />.Snowmass should attempt to Complete construction by then. <br />2. If aonstruction cannot be completed, an extension may be yranted <br />under the condition that operations do not occur on Friday, Saturday, or <br />Sundays due to hunting season. <br />3. Mine personnel shall stay on or adjacent to the designated road at <br />the monitoring site and create as little noise as possible. <br />With this extension we should expect the weirs to be operational by <br />November. Please keep me informed on the progress of your work. <br />Sincerely, __ ~~ <br />~~ . <br />Robert Liddle <br />Reclamation Specialist <br />RL/th <br />Doc. No. 6107 <br />423 Centennial Building. 1313 Sherman Street Denver. Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.