Laserfiche WebLink
Likewise, a monitoring plan has been implemented to <br />• determine the effects of controlled subsidence associated <br />with longwall mining. <br />A Subsidence Control Plan is only required if a <br />determination has been made that there will be material <br />damage or diminution of value to a renewable resource or <br />structure. There has been no damage to existing structures <br />from past mining and no damage or diminution of value is <br />anticipated due to subsidence during the next five year <br />permit term. <br />v-. <br /> <br />2.05-59 <br />• (Revised OS-18-94) <br />