My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE73150
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE73150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:46 PM
Creation date
11/21/2007 12:35:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
4/20/2007
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 12-Right through 16-Right)(PR 99-OS) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. The mine will move its operation <br />• into the Northern Mining District as shown on Map 23, Mine Plan Map. TCC controls all of the coal required to <br />mine in this azea. TCC projects annual coal production at 10 million tons per yeaz. <br />TCC uses the longwall mining method as the primary technique for ensuring maximum recovery of the resource. It <br />is planned to install a 1,000-foot wide face, with panel lengths ranging from approximately 13,600 to 17,000 feet in <br />the Northern Mining district during this permit term. The gateroads, main and submains will be developed by <br />continuous miner, as is the current practice. <br />NMD -14-Right Gateroad Alternate Location (MR O1-171) <br />Currently, TCC is in the process of evaluating if the 1,000-foot wide face can be increased to approximately ],200 <br />feet or wider. The outcome of the evaluation may limit the face width to something less than 1,200 feet. In order <br />to accommodate this uncertainty, and initiate the start of the gateroad, an azea is shown in red on Map 23 and 23 B <br />for potential area in which the 14 Right Gateroad will be started. In the event that the evaluation determines that <br />the 1,000-foot wide face is the correct width for TCC's conditions, the location of the gateroad shown on Maps 23 <br />and 23 B will be followed. <br /> <br />NMD (Panels 17-Right through 21-Right, PR03-06) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. The mine will continue its <br />operation into the Northern Mining District as shown on Map 23, Mine Plan Map. TCC projects annual coal <br />production to increase from the current 10 million tons per year to approximately 12 million tons per yeaz. <br />TCC uses the ]ongwall mining method as the primary technique for ensuring maximum recovery of the resource. <br />In Panels 17- through 21-Right, mining will continue in the Northern Mining district during this pemut term with a <br />• 1,000-foot wide panel and panel lengths ranging from approximately 10,900 to 15,700 feet. The gateroads, main <br />and submains will be developed by continuous miner, as is the current practice. <br />NMD (Pauels 21-Right through 25-Right (24- and 25- Right Partial), PR06-07) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. The mine will continue its <br />operation into the Northern Mining District as shown on Map 23, Mine Plan Map. TCC projects annual coal <br />production of approximately 12 million tons per yeaz. <br />TCC uses the longwall mining method as the primary technique for ensuring maximum recovery of the resource. <br />In Panels 21-through 24-Right, mining will continue in the Northern Mining district during this pemtit term with a <br />1,000-foot wide panel and panel lengths ranging from approximately 9,500 to 15,700 feet. The gateroads, main and <br />submains will be developed by continuous miner, as is current practice. <br />WMD (Panels 15-Left through 18-Left -Initial Development of Mains and submains, PR06-07) <br />In prepazation for future mining in the Western Mining District (WMD), TCC will proceed with initial development <br />of the main and submain entries for Panels 15-Left through 18-Left, as shown on the Mine Plan Map, Map 23. <br />Main and submain entries will be developed by continuous miner, as is current practice. <br />(2) Operation description. A general description and appropriate map(s), prepazed in accordance with 2.10, <br />describing the azea of land to be affected over the life of operation, according to the anticipated sequence of mining <br />and reclamation, and identifying each area of land for which it is anticipated a new, separate, five-yeaz pemut will <br />be obtained and a performance bond will be posted throughout the operation and any change in a facility or feature <br />• shown under 2.10 which would result from the proposed operations. <br />PR06-07 2.05-2.1 05/10/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.