Laserfiche WebLink
. ..-t <br /> DAM INSPECTION REPORT PAGE 2 <br /> YES NO <br />15. IS RELEASED WATER UNDERCUTTING THE OUTLET OR ERODING THE EMBANKMENT? X <br />16. DOES THE SPILLWAY CHANNEL SHOW SIGNIFICANT EROSION,BACKCUTTING <br /> OR DETERIORATION? X <br />17. IS THE SPILLWAY OBSTRUCTED WITH FLASHBOARDS, TREES, DEBRIS, <br /> BRUSH OR OTHER? X <br />18. IS THERE EVIDENCE THAT THE DAM HAS BEEN OVERTOPPED? X <br />19. ARE SPILLWAY WALLS, FLOOR, CONTROL SECTION, AND ENERGY DISSIPATOR <br />IN POOR CONDITION? X <br />20. IS THE OUTLET PIPE BLOCKED, BROKEN, OR EXCESSIVELY CORRODED <br />OR OTHER? X <br />21. IS THE RESERVOIR USUALLY FULL EAR ROUND, OVER ~ YEAR, OR LESS <br />THAN ~ YEAR? X <br />22. SHOULD THIS DAM BE PROMPTLY INSPECTED BY A FIELD ENGINEER? <br />FROM THE STATE ENGINEER'S OFFICES? X <br />23. ADDITIONAL COMMENTS: The spillway has never discharged since construction,. only, <br />the riser which decants the pond has discharged. <br />INSPECTED BY: Michael Weigand <br />