Laserfiche WebLink
MILHAGH: 65 <br /> <br /> <br />• <br />PROJHCT: Haul Road G/Pond <br />LOCATION: Seneca IIW Mine, <br />CLIHNT: Peabody Coal <br />WORK PHRFORMBD: <br />005 DATH: <br />Routt County, COTIMH: <br />HNGR/THCH: <br />6/9/92 <br />3.0 <br />BDL <br />As requested, we visited the project site to test the <br />fill being placed along the haul road being constructed at <br />the Seneca IIW Mine. The majority of the fill was being <br />placed between Sta. 8+00 and 11+00. Two density tests were <br />taken at the approximate locations shown on the attached <br />worksheet. <br />RHMARKS: <br />The tests results indicate that the compaction end <br />moisture tests taken on the fill materials were within <br />specifications. A sample of the clay fill was obtained for a <br />check point proctor. The results did oot match the existing <br />proctor curves completed by Ground fingineering Consultants, <br />Inc. Therefore, a new curve was run and the results are <br />attached. <br />VHRBAL DISCUSSIONS: <br />We discussed the project scope and schedule with Chuck <br />McCulloh of Peabody Coal. He requested that we make two <br />visits to the project site on 6/10/92 end then make one trip <br />per day while the haul road is being constructed. <br />REPORT NO.: 1 <br />PROJECT NO.: 92-1100 <br />