Laserfiche WebLink
<br />• <br />ADDITIONAL INFORMATION <br />1. A. Legal description: <br />. Page 4 <br />Delete this line: Surface Facilities and dump 0.43 acres SW} of <br />NW} of Section 30. <br />Delete: "1.24 acres" in the IJE} of NE} of Section 25 and insert <br />"1.65 acres". <br />Delete: "9.74 total acres" and insert "9.69 total acres". <br />2. A. Reclamation plan: Cribbing has been added to the map in Exhibit C-2. <br />There are two alternatives to the question of what to do with this <br />cribbing in the reclamation plan: Leaving it up and grading the waste <br />dump into the bench to the east which the cribbing helps retain, or <br />taking it down before grading which may increase erosion oP the bench <br />area. Either method is possible and the Bureau oP Land Management has <br />not said how they would like it done. Perhaps the Board would care to <br />comment, iP in fact this is a major point in the reclamation plan. <br />However, according to the D.O.E. lease, recommendations by the Bureau <br />of Land Management must be followed in all reclamation matters. <br />B. Enclosed is a copy of the portion of the lease stipulating that pre- <br />existing roads remain intact. <br />