Figure 14-1 Notes <br />Note 1: Keep road to CRDA-1 open to accept coal and refuse material from other <br />ongoing reclamation activities. This road is within the coal mine waste <br />disposal area; therefore, it is not a DMG regulated road. The road begins <br />at the west end of Haul Road No. 5 and extends to the top of CRDA-1. <br />Note 2: The reclamation of the suspension bridge and Transfer #2 was delayed <br />so the Operator would have time to maximize the commercial value of the <br />bridge. Upon further consideration the decision was made to reclaim the <br />suspension bridge and associated structures. Demolition of the structures <br />was completed in December 2003 and regrading and seeding of the area, <br />along with the conveyor corridor from Transfer #2 to the Excel Culvert, <br />was completed in March 2004. <br />Note 3: The culvert under the Excel Energy road will not be reclaimed. The road, <br />with the culvert in place, provides a favorable haul route for trucks <br />delivering coal to Excel's power plant. <br />Note 4: The reclamation of the office complex, shop, warehouse and Substation A <br />at the portal level and the guard shack, training building and lab buildings <br />at the lower level will be delayed so the operator has time to finalize the <br />sale of the property and submit a permit revision to the Division requesting <br />a land use change in association with the structures and final contours of <br />the area. <br />Note 5: The top of the Roadside Refuse pile will be left open until the sale and <br />land use change application explained in Note 4 has been completed. <br />The top of the refuse pile was used as a material storage area and ft <br />could function the same for the company that acquires the office and shop <br />complex. <br />Rev. 09/05 Figure 14-1 Page 10/10 <br />