Laserfiche WebLink
• When approved by the DMG, ponds 6 and 10 will be reclaimed and <br />Coal Canyon will be realigned as shown on Exhibit 9C. The new <br />alignment was moved to the right so it is more in line with the dip <br />section. The proposed alignment meanders through reclaimed <br />ponds 6 and 10. The material balance for this work is presented in <br />Tab 14-1. <br />South Fan <br />Final contours for the South Fan area will be approximately the original <br />contours shown on Exhibit SL-16-009, Tab 13. The borrow area shown <br />on Exhibit SL-16-009 will be used as necessary to backfill the shaft. The <br />borrow area will be graded to blend in with exiting contours. After salvage <br />operations, the remaining concrete shaft collar and structural foundations <br />will be broken up and pushed into the shaft. The shaft will be backfilled to <br />within approximately 5' feet of the surface and the shaft sealed with a <br />concrete plug approximately 5' thick. The fan bench will be backfilled with <br />material filled on the outside edge of the bench and with material from the <br />two overburden stockpiles nearby. The most suitable plant growth <br />• material will be placed on the fill last and amended as necessary to <br />promote revegetation. The portion of Access Road 3 leading into the fan <br />site will be eliminated by grading it to match the adjacent topography. Silt <br />fences will be utilized as alternative sediment control and placed as <br />shown on Exhibit SL-16-009 <br />• 14-11 i (Rev. 4/03) <br />