Laserfiche WebLink
VOLUME III <br />LIST OF FIGURES -CONTINUED <br />6t Cross-Section Confluence of Middle and Foidel Creeks <br />7 Typical Mine Section <br />7a 1994 Development Drillhole Location <br />7b Preparation Plant Material Temporary Stockpile Location <br />8 Leachate Concentration, Energy Mine No. 1 <br />9 Predicted Leachate Concentration, Energy Mine No. 1 <br />10 Leachate Chemistry, Energy Mine No. 1 <br />11 Predictive Analysis - TDS Concentrations after 50 Years <br />l la Existing Railroad Cross-Sections <br />I lb Railroad Track Extension, Cross-Section, Typical Cut <br />l lc Preparation Plant Topsoil and Plant Growth Media Stockpile Location <br />l ld Wadge Overburden Potentiometric Surface & TDS Concentrations <br />12 Design of Typical Contour Furrow <br />~ 12a We11006-BRDH-7, Period of Record Water Level Data <br />13 Predictive Analysis after Five Years of Mining <br />13a Pond E Aerator <br />14 Typical Subsidence Monument <br />15 Typical Portal Seals <br />16 Rock Dust Bin Operations Design <br />16a Southwest Mining District Ventilation Borehole and Access Road Location <br />16a(1) Southwest Mining District Gate-Roads, Bleeder, and Drainage Rooms <br />16b Gate-Road Extension Area <br />16c 9 & 10 Right Gateroad Extensions <br />16d 1995 Seismic Lines - EMD <br />16e EMD Bleeder Shaft Grading Plan <br />16e(1) EMD Bleeder Shaft Site Plan <br />16f EMD Ventilation Site and Panel Description <br />16g Section 14 Mining Area: Structures 8z Renewable Resources <br />'ton B'Kt~tit'uiny <br />16h(1) 6 Right & 7 Right Irby Development <br />16i 1996 Seismic Lines and Mine Water Return Line <br />TR OS-05/46/47 xiv Revised -January 2005 <br />