Laserfiche WebLink
VOLUME II-C <br />LIST OF EXHIBITS <br />18 Baseline Environment Report for Proposed Coal Mine Expansion <br />19 Fish and Wildlife Resources Information: Eckman Park Permit Area <br />19A Raptor Survey -EMD <br />19B 1997 Raptor Nesting Studies <br />20 Aquatic Biological Survey of Middle Creek and Fish Creek <br />21 Aquatic Biological Survey of Foidel Creek and its Unnamed Tributary <br />22 Aquatic Biology Monitoring Survey of Foidel Creek <br />23 U.S. Fish and Wildlife Service Letter Regarding T & E Species <br />23A Required Lease -Permanent Road Fish Creek (Project Letter from Chevron) <br />24 Soil Conservation Service Letter <br />25 As-Built Certifications of Access/Haui Road <br />25A Refuse Pile Fire-Fighting Plan <br />25A-2 Raised Bore Cuttings Engineering Report <br />25B Roadway Certification Letter, Haul Road B <br />25C Pavement Evaluation & Recommendations, Haul Road B <br />25D <br />25E Roadway Certification Letter, Haul Road B <br />Roadway Certification Letter, Haul Road C <br />25F Roadway Certification Letter, Refuse Pile Haul Road <br />25G Roadway Certification Letter, Explosive Area Access Road <br />25H Roadway Certification Letter, PM Bay Access Road <br />25I Roadway Certification Letter, Pond A Access Road <br />25J Roadway Certification Letter, Rock Dust Bin Access Road <br />25K Roadway Certification Letter, EMD Bleeder Shaft Access Road <br />25L Roadway Certification Letter, Batch Load-Out Access Road <br />25M Roadway Certification Letter, FCM # 1 Access Road <br />25N Refuse Pile North Access Road <br />250 Haul Road A Design <br />25P Pavement Evaluation and Recommendations, Fish Creek Borehole Access Road <br />25Q Certification of HR Between Refuse Pile HR, Fish Creek Borehole Access Road <br />25S NW Mains Vent Shaft Access Road <br />25T 18-Right Ventilation Shaft Geotechnical Pavement Design <br />~25U 6-North Mains Intake Shafr Geotechnical Pavement Design <br />25V Haulroad C-1 Geotechnical Evaluation <br />TR06-55 viii <br />07/26/06 <br />