Laserfiche WebLink
VOLUME <br />LIST OF EXHIBITS <br />8 Sediment Control Plan <br />8A Proposed Dewatering Facility Culvert Sizing <br />8B EMD V ent Fan Site SAE <br />8C EMD Dewatering Facility SAE <br />8C(I) EMD Treatment Pond Design <br />8D Escape Shaft/Light-Duty Road Culvert Design <br />SE Pond E Design <br />8E(1) 8 Right & 7 Right Cross-Panel Grout Operations Pad SAE <br />8E(1)(a) Corral SAE 10 year/24 hour <br />8F CYCC Pond B -Stage Storage -Estimated <br />8G Sedimentation Pond C: Design and certification <br />8H Hydrologic Evaluation of sedimentation Ponds: A, and D and G <br />8hH1) Montgomery Watson Evaluation of Pond D, 1999 <br />8I Sedimentation Pond F: Design and Certification <br />8J CYCC Pond G -Stage Storage <br />8K CYCC Fish Creek Borehole Pond -Stage Storage <br />8L Drill Pad SAE <br />8M Refuse Disposal Pile Bench Channel <br />8N SEDCAD for Diversions: PDl, PD2, PD3, PD4 <br />8P Plate I, Titled, "Sediment Ponds, Energy Mines No. 1 and No. 2 and Eckman Park" <br />8Q Pond T Certification <br />8R Fish Creek Culvert Design, NW Mains Ventilation Shaft, and Fish Creek Borehole Culverts <br />8S Certification -Pond E, Fish Creek Tipple, SAE Demonstration NW Mains Ventilation Shaft <br />8T 18-Right Ventilation Intake Shaft SAE <br />8U Scoria Storage Area and Storage and Training Area SAE/ASC's <br />8V Area 1 Pit Water Storage Basin Impoundment Documentation <br />SW Thickener Overflow Sump Impoundment Documentation <br />8X 6-North Mains Intake Shaft Drainage Designs <br />8Y 18-Right Vent Shaft Access Road Topsoil Stockpile Diversion Ditches <br />8Z CYCC Office Building Drainage Design Documentation <br />8AA Haulroad A -Drainage Designs <br />9 Aquifer Test Data (Confidential Appendix) <br />9A Ground Water Inflow into the Mine -EMD <br />9B 9 Right Gate-Road Faulting <br />9C Underflow Chemical Character <br />TR06-55 vi <br />07/26/06 <br />