Laserfiche WebLink
. - <br />`_, 1 1 <br />`~_ i <br />Received <br />March 26, 2007 ~ 2 ] 2~~] <br />Mr. Wally Erickson t~rran~o FieIC 08fca <br />CDRMS -Durango Field Office ~a'sion of Reclamation, <br />701 Camino del Rio, Ste. 125 afintng and safety ,- <br />Durango, CO 81301~~ ~ ,*~ <br />Re: Adequacy Issues",Martinez-Project File No. 2007-010 <br />Deaz Mr. Erickson: <br />Pursuant to your letter of March 22, 2007, the following is in response to your questions <br />and observations. For clarification, the following responses aze in the same numeric order <br />as your letter. <br />1. Copies of proofs of notices and publication aze attached herein. <br />2. Revisions were made to Exhibits B, E and L to indicate the existence of the hay <br />storage shed in question. A damage compensation agreement is included with Exhibit B. <br />3. Revisions were made to Exhibits B and L in regard to County Road 391. <br />4. A transposition was made in the slope ratio. The attached revised G.S. Exhibit is <br />corrected. <br />5. Exhibit D was revised to show a slope in the reclaimed section not to exceed a 2:1 <br />ratio. Road embankment is now included in this section. <br />6. The required blasting report criteria will be adhered to by the operator/ contractor. <br />7. A pre-blast survey will be conducted by the contractor or other qualified party prior. <br />8. The applicant is in agreement with the observational planning method discussed. The <br />requirements for reporting observations and plan modifications will be followed. <br />Please contact me with any questions or comments you may have. <br />Sincere <br />Matt ahan <br />Agent r Weber Sand & Gravel, Inc. <br />xc: A. Weber <br />RECEIVED <br />APR 0 4 2001 <br />Division of Reclamation, <br />Mining and Safety <br />Matt Carnahan - 15 W. Mill Street, Ste 214 - P O Box 1951 - Bayfield, Colorado 81122 <br />(970) 759-5463 Fax: (970) 884-5062 <br />