My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30476
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:11 PM
Creation date
11/21/2007 12:27:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
1/12/2005
Doc Name
December 2004 Monthly Report
From
Battle Mountain Resources Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />January 10, 2005 <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />JAN i 2 2~~5 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2004 Monthly Report <br />Dear Mr. Waldron: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of December 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality ConVOI <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on December 31", no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />December 29`h, the West Pit and tailings embankment monitoring wells were collected on <br />December 29`". The December 29th tailing impoundment piezometer measurements identified <br />these installations were either dry or contained less than 12 inches of water as illustrated in Table <br />2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br />monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR- <br />32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />December 29'". The December tailings pond underdrain flow average was 43.70 gpm and a total <br />of 540 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 17.4 gpad. <br />During December, the West Pit water Veatment plant operated efficiently discharging a total of <br />8,465,100 gallons (25.98 acre-feet) of water to Rito Seco Creek and a total of 468,000 gallons <br />(1.44 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for December was i .0" inches, with the largest accumulation <br />occurring on December 27'" (.17"). <br />PA. Box 310 San Luis, Colorado 8 1 1 52-03 10 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.