Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />E~~.4 <br />S Coa~Company Seneca Coal Company <br />September 20, 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Yoast Mine <br />Dear Ms. Crosby: <br />Enclosed is the third quarter inspection report for Pond 010 at <br />the Yoast Mine. Conditions appeared stable and acceptable. Pond <br />010 was constructed during July and completed in August. <br />Technical Revision No. 4, Pond 010 As-Built Report and <br />Certification was submitted earlier this month to the Division <br />for inclusion into the permit application package. <br />If you have any questions, please call me. <br />Sincere <br />Michae .6 ~ A~tavil <br />Enqinee ~'Iq ManagQ <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />P.E. <br />SEP 2 0 1996 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />