Laserfiche WebLink
80WIE RESOURCES t_IMITED <br />SEDIMENT POND C CERTIFICATION <br />In accordance with Rule 4.05.6(10), each sediment pond will be inspected during <br />construction under the supervision of, and certified after construction by, a qualified <br />registered professional engineer. This certification is for the construction of Sediment <br />Pond C at the Bowie No. 2 Mine which was constructed during April 1997. <br />The construction of the pond was supervised by the undersigned. I have a wide variety <br />of experience in the construction industry and have supervised the construction of <br />numerous sediment ponds. <br />Pond C is located north of old State Highway 133 and north of the old Bowie railroad spur. <br />It is located in the vicinity of the old power house on the east side of the disturbed area. <br />The design of pond C is shown on Map 22-C, dated 12-20-96. The design calculations for <br />pond C are contained in Volume III, Exhibit 8, page Exh~-8. To the best of my knowledge <br />and belief, sedime O,ppp~ C was constructed in accordance with the approved plan. <br />• P~,...., 9~.v <br />.~ O~.~S E. Sl0 Fy^, <br />e° ~ G ~a• <br />•~'~Q- <br />~,, ames E.• laver Date <br />•~o~.,• Colorad~,~~fessional Engineer <br />`.fs_c'1Qegis'~Wf34~~i No. 19230 <br /> <br />\WP60UES\CERT,C~R7 <br />