My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72825
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:21 PM
Creation date
11/21/2007 12:26:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/18/2006
Doc Name
NPDES Permit
Section_Exhibit Name
Tab 15 Appendix 15-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. 31 <br />• Permit No.: CO-0000221 <br />c. SWMPReguiremenfs <br />i. SWMP Submittal/Review/Changes: The Division reserves the right to request and review the plan, and [o require <br />additional measures [o prevent and control pollution, as needed. Upon review of [he S WMP, the Division may <br />notify the permittee at any time that the plan does not meet one or more of the minimum requirements of this permit. <br />After such notification, the permittee shall make changes to the plan. Unless otherwise provided by the Division, the <br />perni[tee shall have 30 days after such notification to both make the necessary changes to the plan and to implement <br />them. <br />The permit[ee shall amend [he plan whenever there is a change in design, construction, operation, or maintenance <br />which has a significant effect on the potential fot the discharge of pollutants to the waters of [he State, or if the <br />SWMP proves [o be ineffective in achieving the general objectives of controlling pollutants in stormwater discharges <br />associated with mining activity. Amendments to the plan shall be summarized in the Annual Report. <br />d. Prohibition otNnn-stormwater Discharges <br />i. Except as provided in paragraph b, below, all discharges authorized by the stormwater portion of this permit <br />shall be composed entirely of stormwater. Discharges of water other than stormwater must be addressed in a <br />separate CDPS permit issued for that discharge. <br />ii. Discharges from the following sources that are combined with stormwater discharges associated with mining activity <br />may be authorized the stormwater portion of this permit, provided that [he non-stormwater component of the <br />discharge is identified in the SWMP (see Part I,D.Z.c of the permit): fire fighting activities, uncontaminated <br />compressor condensate, irrigation drainage, lawn watering, air conditioner condensate, uncontaminated seeps and <br />springs, and foundation or footing drains where flows are no[ contaminated. <br />• ,,. Facility Inspections <br />Qualified personnel identified by the operator shall make a thorough inspection of their stormwater management system, <br />at least twice per year (in the spring and fall). These inspections must be documented and summarized in the Annual <br />Report (see Part LE.1 of the permit), <br />The inspections must include the following: <br />i. Disturbed areas and areas used for material storage that are exposed to precipitation shall be inspected for evidence <br />of, or the potential for, pollutants entering [he drainage system. Erosion and sediment control measures identified in <br />[he SWMP shall be observed to ensure that [hey are operating correctly. <br />ii. Based on [he results of the inspection, [he description of the potential pollutant sources and the pollution prevention <br />and control measures that are identified in the SWMP shall be revised as appropriate as soon as practicable after <br />such inspection. Revised control measures shall be implemented a timely manner, but in no case more than 90 <br />calendar days after the inspection, unless otherwise provided by the Division. <br />iii. The operator shall keep a record of inspections, including the date of the inspection, major observations relating to <br />the implementation of the S WMP, and actions taken in accordance with paragraph 2), above. This record shall be <br />made available to the Division upon request and summarized in the Annual Report. <br />E SWMP Availability <br />Upon request, the pennittee shall submit a copy of the SWMP to the Division, the Colorado Division of Minerals and <br />Geology and EPA, and any local agency approving sediment and erosion plans or stormwater management plans, within <br />the time frames specified in the request. <br />• t\II SWMPs required under this permit are considered reports that shall be available to the public under Section 308(b) of <br />the CWA. The owner or operator of a facility with stormwater discharges covered by this permit shall make plans <br />available to members of the public upon request, unless the SWMP has been submitted to the Division. However, the <br />permit[ee may claim any portion of a SWMP as confidential in accordance with 40 CFR part 2. <br />g. Annual Report <br />The permit[ee will be required to submit an Annual Report, covering January 1 through December 31 of each year, on the <br />overall compliance with the SWMP. The Annual Report shall contain, at a minimum: <br />
The URL can be used to link to this page
Your browser does not support the video tag.