Laserfiche WebLink
A passenger car parking area is provided adjacent to the office/change house building. A <br />• new, gravel-surfaced parking area will be constructed at the truck loading building. <br />Sewage Water and Stormwater Facilities <br />A septic system was provided to collect all sewage water from the office and change house <br />trailers. Storm water runoff from the facilities area is accumulated in the two <br />sedimentation ponds. <br />Power Transmission <br />Power entering the permit area is shown on Exhibit 12-1, Facilities Map. <br />! 1 <br />~~ <br /> <br />TR-06 19 Revised 05/05 <br />