Laserfiche WebLink
The reason for the cracking was again attributed to expansive soils, although the mechanism was <br />quite different that what I had originally postulated. Lincoln DeVore concludes, as I did, that the <br />embankment and its foundations appear to be stable at this time. The Deserado mine will, because <br />it can be done during routine inspections, maintain the inspection procedures outlined in the <br />original inspection report letter dated 6/10/96. We will inform the DMG immediately upon the <br />discovery of any change in the status of the embankment that could endanger its stability. <br />//With~h Roega~rds, /~ <br />!~/~Z~'y'!yI C~ <br />William C. Lepro, P.E. <br />Project Engineer <br />Enclosures: Lincoln DeVore Report <br />xc: Gordon Bell <br />Murari Shrestha <br />File <br />