Laserfiche WebLink
Srormwaur Manogerncnt Plan <br />To further control pollutants at the Reclaimed Chimney Rock Coal Mine, other manage- <br />ment practices will be utilized. While the U.S. Environmental Protection Agency specifies <br />eleven items as significant aspects of stormwater pollution control and management, not all <br />eleven of these practices apply to the Reclaimed Chimney Rock Coal Mine. Those that are <br />implemented are described below. <br />' • Sedimentation and Erosion Prevention. Mitigation measures have already been <br />undertaken for the mine site, specifically sedimentation ponds 002, 003, 004 and 005. <br />• Preventive maintenance. At the Reclaimed Chimney Rock Coal Mine, preventive <br />maintenance will be practiced at the site to ensure the proper operation of <br />' sedimentation ponds 002, 003, 004 and 005. <br />• Good housekeeping. The reclaimed site will continue to be kept in a clean, orderly <br />' fashion. <br />• Non-stormwater discharges. The plan will include certification that stormwater <br />' discharge do not contain non-stormwater discharges. This certification will include <br />all portions of the stormwater system including swales, culverts, and ditches. <br />' • Visual inspection. The plan will include a visual inspection of the Reclaimed <br />Chimney Rock Coal Mine Site as part of its annual rill and gully inspection program <br />and NPDES monitoring. <br />1 <br /> <br /> <br />8 <br />