Laserfiche WebLink
<br />• <br />10. Primary future <br />(Post-mining) <br />land use <br />(check one): <br />11. Primary rea sent <br />land use <br />(check one): <br /> <br />Cropland(CR) <br />X Rangeland<RL) <br />Residential(RS) <br />_ Developed Water <br />Cropland(CR> <br />X Rangeland(RL) <br />Residenttal(RS) <br />_ Developed Water <br />lJ <br />-3- <br />_ Pastureland<PL) <br />_ Forestry<FR) <br />Recreation<RC) <br />Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat<WL3 <br />Industrial/Commercial(IC) <br />_ Solid Waste Disposal(WD) <br />_ Pastureland<PL) <br />_ Forestry(FR> <br />Recreation(RC) <br />Resources(WR) <br />_ General Agriculture<GA) <br />_ Wildlife Habitat(WL> <br />Industrial/Commercial(IC) <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel>. Ooen oit <br />gravel mining - utilizing loaders, scrapers, bulldozers. trucks. and screen. <br />13. On Site Processing: Solution (50) Chemical (CH) _ Thermal (TH> <br />_ Heap Leach <HL) _ Vat Leach (VL) <br />14. ADpticatlon Fee: <br />The application fee for quarry mining is ;2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />is E3,100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee is E1,875. <br />An applicant will not be issued a reclamation permit until notified by the Div151on that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even 1f you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGTN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shaii be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed 1n your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit 1s issued. <br />• <br />