My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30427
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:09 PM
Creation date
11/21/2007 12:24:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
Hydrology
Doc Date
5/11/2004
Doc Name
Substitute Water Supply Plan
From
SEO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Ray Dunn <br />May 10, 2004 <br />Page 4 <br />12. Should a request for renewal of this plan be needed, such renewal request must be <br />submitted to this office at least 45 days prior to the expiration date of this plan (April 16, <br />2006). <br />13. This plan may be revoked or modified at any time should it be determined that injury to <br />other vested water rights has or will occur as a result of the operation of this plan. <br />14. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all ground water pumping and mining of <br />product from below the ground water table must cease immediately. <br />15. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the state engineer shall determine <br />whether or not the substitute supply is of a quality to meet requirements of use to senior <br />appropriators. As such, water quality data or analysis may be requested at any time to <br />determine if the water quality is appropriate for downstream water users. <br />16. Acceptance of these conditions shall be assumed unless a letter to the contrary is received <br />by this office, the Division Engineer (Steve Witte, 310 E. Abriendo, Suite B, Pueblo CO <br />81004), and the Water Commissioner (Charlie Judge, P.O. Box 100, Wetmore, CO 81253) <br />within two weeks of your receipt of this letter. <br />Should you have any questions, please contact Heidi Frey of this office or Brian Boughton, <br />Augmentation Coordinator, in our Division 2 office in Pueblo at (719) 542-3368. <br />Sincerely,- 0 C7/ <br />~Gl~ <br />' k Wolfe, P.E. <br />Chief of Water Supply <br />cc: Division 2 <br />Charlie Judge, Water Commissioner <br />Division of Minerals and Geology <br />DW/HCF:word/grisenti <br />
The URL can be used to link to this page
Your browser does not support the video tag.