My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72737
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:16 PM
Creation date
11/21/2007 12:23:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
Permit File
Doc Date
9/3/2003
Doc Name
Exh C-3 Mining Plan Map
From
Haldorson & Sons
To
DMG
Section_Exhibit Name
EXH C
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60' NOW <br />600' OFFSET <br />TO ACCESS ROAD <br />SCALE HOUSE /OFFICE <br />MAINTENANCE BUILDING <br />ACTUAL NUMBER OF <br />TREES MAY VARY <br />l <br />GASLINE MARKER <br />TOPSOIL STOCKPILE FROM <br />PHASES 2 AND 3 <br />11 IF 1. - <br />STRIPPING <br />BATCH PLANT <br />I IGRAVEL i <br />I -- - - - - - -- I PLANT I � <br />ii 11 <br />< _ t <br />I iI II <br />�I I <br />-- - -- - -- - <br />lJ TEMPORARY AGGREGATE CRUSHING AN <br />in <br />m . IHAUL ROUTE r� .SCREENING PLANT <br />PHASE 2 NORTHERN I'. ✓ <br />I (APPROX. 10.7 ACRES) <br />60' ROW I <br />#� OVERBURDEN STOCKPILE <br />I-,FROM PHASE 1 AT 30' HIGH <br />CHIPETA WATER <br />DISTRICT EASEMENT - <br />I <br />I I C <br />t <br />SETTLING POND I L -_ -s' - -- _ - r <br />PHASE 2 SOUTHERN <br />(APPROX. 18.4 ACRES) <br />I <br />SETTLING POND <br />I <br />I I <br />I 25' <br />(TYP. FROM ROW f- <br />I <br />PHASE 3 AND PROPERTY LINE) <br />(APPROX. 25.7 ACRES) <br />I I <br />I I <br />I <br />I 1 <br />I <br />I I <br />I <br />I 25' <br />(TYP.) I <br />PHASE 4 I <br />(APPROX- 28.6 ACRES) <br />I I <br />I I <br />II <br />I I <br />I I <br />1 <br />� l I <br />IDIVERSION DITCH <br />FOR PROCESSING WATER <br />I <br />I <br />I I <br />PHASE 5 <br />(APPROX. 28.5 ACRES) <br />I N <br />II <br />I <br />eel ® SeIg ` <br />BERM FROM TOPSOIL STRIPPING <br />PHASE 1 <br />CJN LATERAL <br />STRUCTURES IN THIS <br />AREA WILL BE REMOVED <br />TOPSOIL STOCKPILE FROM <br />PHASES 2 AND 3 <br />I <br />1 <br />I <br />F <br />R <br />E: <br />RE <br />VARIES <br />NOTE: TYPE OF GRASS AND SEED <br />MIXES WILL BE DETERMINED BASED ON <br />RECOMMENDATIONS FROM MONTROSE <br />COUNTY NRCS. <br />INDUSTRIAL <br />ACTIVITIES <br />CROSS- SECTION OF TEMPORARY BERMS <br />FROM TOPSOIL STRIPPED DURING PHASE 1 <br />PUBLIC GRASS <br />R.O.W./ <br />EXISTING <br />RESIDENCE <br />FM <br />NOT TO SCALE <br />GRASS <br />INDUSTRIAL <br />NOTE: TYPE OF GRASS AND SEED <br />MIXES WILL BE DETERMINED BASED ON <br />RECOMMENDATIONS FROM MONTROSE <br />COUNTY NRCS. <br />CROSS - SECTION OF TEMPORARY BERMS <br />FROM TOPSOIL STRIPPED DURING <br />PHASES 2 AND 3 <br />NOT TO SCALE <br />1. EQUIPMENT ASSOCIATED WITH PROCESSING FACILITIES AND ACTUAL PLANT <br />LAYOUT MAY BE SUBJECT TO CHANGE AS FIELD CONDITIONS DICTATE. <br />2. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS MONTROSE WEST QUADRANGLE <br />AT 20 FOOT CONTOUR INTERVALS AND INTERPOLATED AT 2 FOOT CONTOUR <br />INTERVALS. <br />3. MINING WILL OCCUR AT 3:1 SLOPE TO PIT FLOOR. <br />4. NO GROUNDWATER WILL BE ENCOUNTERED DURING MINING. <br />5. TOPSOIL STRIPPED DURING PHASE 1 WILL BE PLACED IN LANDSCAPED BERM IN <br />SOUTHWEST CORNER OF PROPERTY AND WILL REMAIN PERMANENT. TOPSOIL <br />STRIPPED DURING PHASES 2 AND 3 WILL BE PLACED AS A TEMPORARY <br />SCREENING BERM AROUND NORTH, WEST AND EAST PROPERTY BOUNDARIES AND <br />WILL BE PLACED INTO PHASES 1, 2 NORTH AND PHASE 5 AFTER COMPLETION <br />OF PHASE 5 MINING. TOPSOIL STRIPPED DURING PHASE 4 WILL BE PLACED <br />DIRECTLY INTO PHASE 3. TOPSOIL STRIPPED DURING PHASE 5 WILL BE PLACED <br />DIRECTLY INTO PHASE 4. <br />6. OVERBURDEN STRIPPED FROM PHASE ONE WILL BE TEMPORARILY STOCKPILED <br />IN PHASE 2 NORTH THEN PLACED BACK INTO PHASE 1. ALL OTHER <br />OVERBURDEN STRIPPED WILL BE PLACED DIRECTLY INTO PHASE 1 AND PHASE 2 <br />NORTH FOR RECLAMATION- <br />GRAPHIC GRAPHIC o <br />SCALE +oo <br />( IN FEET ) <br />1 inch = 200 ft. <br />LEGEND <br />125' (TYP. FROM <br />HALDORSON SAND AND GRAVEL MINE <br />PROPERTY LINE <br />MINING LIMITS <br />RESIDENTIAL <br />EASEMENT /ROW <br />MONTROSE COUNTY <br />EXISTING STRUCTURE <br />OLATHE, CO 81425 <br />i <br />+ <br />STRUCTURES) <br />SCALE <br />I <br />CI <br />_------- PROPOSED HAUL ROUTE <br />REV <br />PHASE 1 <br />03023 <br />FIBER OPTIC CABLE <br />O <br />OVERHEAD UTILITIES <br />(APPROX. 23.5 ACRES) <br />CONCRETE BATCH <br />W. <br />— — — — <br />----------- <br />- - - - -- - <br />PLANT <br />I <br />o I <br />I <br />i ----------- <br />- - - - -- -- , <br />EXISTING INDEX CONTOUR <br />N1 <br />TEMPORARYij <br />PROPOSED TREE <br />TOPSOIL <br />BERM FROMi 160' <br />I <br />—► <br />ASPHALT <br />ROW <br />STRIPPING <br />BATCH PLANT <br />I IGRAVEL i <br />I -- - - - - - -- I PLANT I � <br />ii 11 <br />< _ t <br />I iI II <br />�I I <br />-- - -- - -- - <br />lJ TEMPORARY AGGREGATE CRUSHING AN <br />in <br />m . IHAUL ROUTE r� .SCREENING PLANT <br />PHASE 2 NORTHERN I'. ✓ <br />I (APPROX. 10.7 ACRES) <br />60' ROW I <br />#� OVERBURDEN STOCKPILE <br />I-,FROM PHASE 1 AT 30' HIGH <br />CHIPETA WATER <br />DISTRICT EASEMENT - <br />I <br />I I C <br />t <br />SETTLING POND I L -_ -s' - -- _ - r <br />PHASE 2 SOUTHERN <br />(APPROX. 18.4 ACRES) <br />I <br />SETTLING POND <br />I <br />I I <br />I 25' <br />(TYP. FROM ROW f- <br />I <br />PHASE 3 AND PROPERTY LINE) <br />(APPROX. 25.7 ACRES) <br />I I <br />I I <br />I <br />I 1 <br />I <br />I I <br />I <br />I 25' <br />(TYP.) I <br />PHASE 4 I <br />(APPROX- 28.6 ACRES) <br />I I <br />I I <br />II <br />I I <br />I I <br />1 <br />� l I <br />IDIVERSION DITCH <br />FOR PROCESSING WATER <br />I <br />I <br />I I <br />PHASE 5 <br />(APPROX. 28.5 ACRES) <br />I N <br />II <br />I <br />eel ® SeIg ` <br />BERM FROM TOPSOIL STRIPPING <br />PHASE 1 <br />CJN LATERAL <br />STRUCTURES IN THIS <br />AREA WILL BE REMOVED <br />TOPSOIL STOCKPILE FROM <br />PHASES 2 AND 3 <br />I <br />1 <br />I <br />F <br />R <br />E: <br />RE <br />VARIES <br />NOTE: TYPE OF GRASS AND SEED <br />MIXES WILL BE DETERMINED BASED ON <br />RECOMMENDATIONS FROM MONTROSE <br />COUNTY NRCS. <br />INDUSTRIAL <br />ACTIVITIES <br />CROSS- SECTION OF TEMPORARY BERMS <br />FROM TOPSOIL STRIPPED DURING PHASE 1 <br />PUBLIC GRASS <br />R.O.W./ <br />EXISTING <br />RESIDENCE <br />FM <br />NOT TO SCALE <br />GRASS <br />INDUSTRIAL <br />NOTE: TYPE OF GRASS AND SEED <br />MIXES WILL BE DETERMINED BASED ON <br />RECOMMENDATIONS FROM MONTROSE <br />COUNTY NRCS. <br />CROSS - SECTION OF TEMPORARY BERMS <br />FROM TOPSOIL STRIPPED DURING <br />PHASES 2 AND 3 <br />NOT TO SCALE <br />1. EQUIPMENT ASSOCIATED WITH PROCESSING FACILITIES AND ACTUAL PLANT <br />LAYOUT MAY BE SUBJECT TO CHANGE AS FIELD CONDITIONS DICTATE. <br />2. TOPOGRAPHICAL CONTOURS TAKEN FROM USGS MONTROSE WEST QUADRANGLE <br />AT 20 FOOT CONTOUR INTERVALS AND INTERPOLATED AT 2 FOOT CONTOUR <br />INTERVALS. <br />3. MINING WILL OCCUR AT 3:1 SLOPE TO PIT FLOOR. <br />4. NO GROUNDWATER WILL BE ENCOUNTERED DURING MINING. <br />5. TOPSOIL STRIPPED DURING PHASE 1 WILL BE PLACED IN LANDSCAPED BERM IN <br />SOUTHWEST CORNER OF PROPERTY AND WILL REMAIN PERMANENT. TOPSOIL <br />STRIPPED DURING PHASES 2 AND 3 WILL BE PLACED AS A TEMPORARY <br />SCREENING BERM AROUND NORTH, WEST AND EAST PROPERTY BOUNDARIES AND <br />WILL BE PLACED INTO PHASES 1, 2 NORTH AND PHASE 5 AFTER COMPLETION <br />OF PHASE 5 MINING. TOPSOIL STRIPPED DURING PHASE 4 WILL BE PLACED <br />DIRECTLY INTO PHASE 3. TOPSOIL STRIPPED DURING PHASE 5 WILL BE PLACED <br />DIRECTLY INTO PHASE 4. <br />6. OVERBURDEN STRIPPED FROM PHASE ONE WILL BE TEMPORARILY STOCKPILED <br />IN PHASE 2 NORTH THEN PLACED BACK INTO PHASE 1. ALL OTHER <br />OVERBURDEN STRIPPED WILL BE PLACED DIRECTLY INTO PHASE 1 AND PHASE 2 <br />NORTH FOR RECLAMATION- <br />GRAPHIC GRAPHIC o <br />SCALE +oo <br />( IN FEET ) <br />1 inch = 200 ft. <br />LEGEND <br />,l <br />NAME <br />PREPARED UNDER THE SUPERVISION OF: <br />DATE <br />QUALIFIED AS A PROFESSIONAL GEOLOGIST AS DEFINED <br />BY COLORADO STATUTE. <br />EXHIBIT C4 MINING PLAN MAP <br />W=i <br />Z <br />m <br />c C7 <br />C? Ca C <br />C Q „ <br />U � F <br />N <br />d <br />o E <br />M in <br />O O N <br />N •M N 0 <br />C <br />a,� e P <br />m m <br />z0 <br />N t U V <br />m o <br />av u. 00 <br />SEP 0 <br />amM.Jeaee <br />EN BAm O, LLC. <br />SECTION LINE <br />HALDORSON SAND AND GRAVEL MINE <br />PROPERTY LINE <br />MINING LIMITS <br />_— <br />EASEMENT /ROW <br />MONTROSE COUNTY <br />EXISTING STRUCTURE <br />OLATHE, CO 81425 <br />PAVED ROAD <br />JOB NO <br />TE <br />SCALE <br />UNPAVED ROAD <br />------------- _--------------- __ <br />_------- PROPOSED HAUL ROUTE <br />REV <br />FENCE <br />03023 <br />FIBER OPTIC CABLE <br />1" =200' <br />OVERHEAD UTILITIES <br />WATER LINE <br />1 <br />FIRE HYDRANT <br />— — — — <br />— — DITCH <br />CULVERT <br />EXISTING VEGETATION <br />LANDSCAPED BERM (SEE DETAIL) <br />EXISTING INDEX CONTOUR <br />EXISTING INTERMEDIATE CONTOUR <br />DIRECTION OF MINING <br />PROPOSED TREE <br />,l <br />NAME <br />PREPARED UNDER THE SUPERVISION OF: <br />DATE <br />QUALIFIED AS A PROFESSIONAL GEOLOGIST AS DEFINED <br />BY COLORADO STATUTE. <br />EXHIBIT C4 MINING PLAN MAP <br />W=i <br />Z <br />m <br />c C7 <br />C? Ca C <br />C Q „ <br />U � F <br />N <br />d <br />o E <br />M in <br />O O N <br />N •M N 0 <br />C <br />a,� e P <br />m m <br />z0 <br />N t U V <br />m o <br />av u. 00 <br />SEP 0 <br />amM.Jeaee <br />EN BAm O, LLC. <br />HALDORSON & SONS, INC. <br />HALDORSON SAND AND GRAVEL MINE <br />DMG 112 PERMIT APPLICATION <br />No 720 TE 117 <br />LAK 80215 <br />61190 FALCON RD. <br />MONTROSE COUNTY <br />7 <br />OLATHE, CO 81425 <br />COLORADO <br />JOB NO <br />TE <br />SCALE <br />DRAWN BY <br />DESIGNED BY <br />APPROVAL <br />REV <br />SHEET <br />03023 <br />�03 <br />1" =200' <br />DRF <br />1 <br />of <br />
The URL can be used to link to this page
Your browser does not support the video tag.