Laserfiche WebLink
<br />Item 5. 1975 "8" Pit Reclamation <br />1. D-8 Dozer 6 wks. @ 1590(wk = $ 9,540 <br />2. 633 Scraper !z mo. @ 7574/mo = 3,787 <br />3. 50 T Trucks 3 x 1a mo x 7000/nio = 5,250 <br />4. H400 Loader 1 week @ 2960/wk = 2,960 <br />5. Seeder 2 days @ 100 = 200 <br />6. Seed 500 lbs @ 51.33/cwt = 257 <br /> $21,994 <br />7. Labor 480 mhrs @ $6/hr = 2,880 <br /> Total 1975 - $24,874 <br /> 1974 "B" Pit Reclamation <br />1. Dozer 6 wks @ 1590/wk = $ 9,540 <br />2. Scraper %Z mo @ 7574/mo = 3,787 <br />3. 50 T Trucks 3 x ', mo x 7000/mo = 5,250 <br />4. 10 Yd. Loader 1 wk @ 2960/wk = 2,960 <br />5. Seeder 2 days @ 100/day _ .200 <br />6. Pump 2 mo @ 366/mo = 732 <br />7. Labor 600 mhrs @ 5.50 = 3,300 <br />8. Seed 500 lbs @ 51.33/cwt = 257 <br /> $26,026 <br /> Less 10~ Escalation = 2,602 <br />$23,424 <br />1973 <br />Same as 1974 $23,424 <br />Less lOti escalation 2,342 <br />$21 ,082 <br />1972 <br />No reclamation <br />1971 <br />Estimate X15,000 <br />