My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72719
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:16 PM
Creation date
11/21/2007 12:23:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Doc Name
RECLAMATION COST ESTIMATE PHASES I AND II
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. <br /> <br />Task No. 24 Remove Granite Quarry bridge (concrete & girders) 8,909.00 <br />Task No. 25 Rough grade Phase I A & B pit slopes & floor (D-8) 3,302-88 <br />Task No. 26 Haul 9" topsoil to Phase I A & B 16.8 ac. area (truck loader) 1=4,89.00 <br />Task No. 26b Grade topsoiled Phase I A & B 16.8 ac. azea (motor grader) 1,007.13 <br />Task No. 27 Revegetate gravel pit areas Phase I A & B (16.8 ac.) 14,3I7.70* <br />Task No. 28 Rough grade Phase Il azea (D-8) 4,028.12 <br />Task No. 29 Haul 9" topsoil to 18.2 ac. Phase II azea (truck/loader) 17,449.00 <br />Task No. 29b Grade topsoiled Phase II azea (motor grader) 1,091.05 <br />Task No. 30 Revegetate Phase II gravel pit area (18.2 ac.) 16,982.62* <br />Task No. 31 Rip gravel plant stockpile area 18.1 ac. (D-8) 5,246.43 <br />Task No. 32a Topsoil ~/z plant/stockpile azea (truck loader) 7,951.00 <br />Task No. 32b Topsoil ~/x plant/stockpile area (D-8) 3,486.59 <br />Task No. 33 Grade topsoiled 18.1 ac. gravel plandstockpile area (motor grader) 1,085.06 <br />Task No. 34 Revegetate plant stockpile azea (18.1 ac.) 15,424.57* <br />Task No. 35 Rip road turnaround to north permanent Rd. (D8N) 218.10 <br />Task No. 36 Place 12" topsoil on rd. turnaround [o permanent Rd. (truck loader) 964.00 <br />Task No. 37 Grade topsoiled road turnazound to permanent rd. (motor grader) 47.96 <br />Task No. 38 Revegetate Rd. turnaround to permanent notth rd. 0.8 ac. 681.75* <br />Task No. 39 Remove scale 1,497.07 <br />Task No. 40 Mob.-Demob. D-8N dozer & haul rig $212.00/lu <br /> 2 hours Mob. 2 hours Demb. 848.00 <br />Task No. 41 Mob.-Demob. Cat 769C haul truck & Cat 980C FEL (2 haul rigs) <br /> $611.62/hr 2 hr. Mob. 2 hr. Demob. 2,446.48 <br />Task No. 42 Mob.-Demob. Cat 14 G motor grader <br /> $89.06/hr 2 hours 178.12 <br />Task No. 43 Mob.-Demob. Reclamation equipment <br /> Power mulcher $100/hr 4 hours 400.00 <br /> Farm tractor & implements $100/hr 4 hrs. 400.00 <br />Task No. 44 Supervisor & pick-up [tuck 25% of total job hours, $26.00/hr. 3,811.86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.