Laserfiche WebLink
SUMMARY SHEET Part 2 of 2 <br />• Sediment Ponds = 13,309 <br /> Dredge Sediment Ponds = 312,663 <br /> Grade Diversion Ditches = 2,175 <br /> Reclaim Stocktanks = 32,646 <br /> Remove Flumes = 1,855 <br /> Seal Drill Holes & Monitor Wells = 24,290 <br /> Reclaim Light-Use Roads = 30,084 <br /> Remove Debris = 15,527 <br /> Total Facilities = 1,200,100 <br /> Miscellaneous Items <br /> Light Plants and Support Equipment = 10,872 <br /> Terrace Construction = 10,115 <br /> Repair Rills and Maintain Roads = 78,620 <br /> Dispose of Hazardous Waste = 6,750 <br /> Dispose of Fuel Tank Sludge = 3,900 <br /> Haul Coal and Slack Piles to Pit = 10,931 <br /> Total Miscellaneous = 121,188 <br /> TOTAL DIRECT COSTS = 5,900,499 <br />• INDIRECT COSTS <br /> Mobilization and Demobilization <br /> (5% of Direct Costs) = 295,025 <br /> Engineering Redesign Fee <br /> (4.5% of Direct Costs) = 265,522 <br /> Contractor Profit and Overhead <br /> (6.7% of Direct Costs) = 395,333 <br /> Reclamation Management Fee <br /> (3.5% of Direct Costs) = 206,517 <br /> Public Liability Insurance <br /> (1.55% of Direct Costs) = 91,458 <br /> Contractors Performance Bond <br /> (1.05% of Direct Costs) = 61,955 <br />TOTAL INDIRECT COSTS = 1,315,811 <br />TOTAL RECLAMATION LIABILITY = 7,216,310 <br />L J <br />10 Revised 7/01 <br />