Laserfiche WebLink
~~_ (5) Topsoil 257 <br /> (6) Overburden 265 <br /> (7) Coal Handling Structures 279 <br /> (8) Coal Processing Waste and Non-Coal 280 <br /> Processing Waste <br /> (9) Underground Development Waste 284 <br />. 4 Reclamation Plan 286 <br />(2 )(a) Timetable 289 <br /> (b) Reclamation cost estimate 290 <br /> (c) Backfilling and Grading 291 <br /> (d) Topsoil 293 <br /> (e) Revegetation 294 <br /> (f) Disposal of Debris, etc. 304 <br /> (g) Sealing mine openings 307 <br /> (h) Compliance with Clean Air Act and Clean Water 310 <br /> Act <br />. 5 Post-Mining Land Use 311 <br />. 6 Mitigation of the Impacts 317 <br />(1) Air Pollution 317 <br />(2) Fish and Wildlife 320 <br />(3) Protection of Hydrologic Balance 324 <br />(4) Protection of Public Parks and Historic Places 344 <br />(5) Surface Mining Near Underground Mining 345 <br />(6) Subsidence 346 <br />2.06. Requirements for Permits for Special Categories, 347 <br />• 350 <br />.8(3) AVF Determination <br />4.05. Hydrologic Balance 364 <br />~~ <br />iii <br />