Laserfiche WebLink
._ /.~ <br />Stormwater Permit Requirements for Minting Activities <br />:tune 22, 1995 <br />1?age 2 <br />Permit Requirements <br />The major permit requirement is implementation of a SWMP. The objective of the SWMP is to <br />identify sources of stormwater pollution and then implement Best Management Practices to control <br />those souttres. If a discharge of stormwater leaves the site without implementation of a SWMP or <br />without the acquisition of a stormwater discharge permit, it is a violation of the Colorado Water <br />Quality Control Act and is subject to enforcement action by the Water Quality Contro] Division. The <br />Colorado Water Quality Control Act authorizes both civil and criminal penalties for willful non- <br />compliance. <br />Potential Exemptions <br />If a stotmwater permit is not applicable to this operation, please send us a letter detailing the basis for <br />this, by the above deadline. Two potential exemptions are available. If all runoff from the mine site <br />is contained on the site, with no discharge off site, a stotmwater permit is not required. Bond release <br />from the site's MLRB reclamation permit is another acceptable basis for exemption. <br />If there are any questions regarding the stotmwater program, please give me a call at (303) 692-3606. <br />Sincerely, <br />Daniel M. Beley <br />Environmental Protection Specialist <br />Permits and Enforcement Section <br />WATER QUALITY CONTROL DIVISION <br />Enclosure <br />xc:: District Engineer, WQCD <br />