Laserfiche WebLink
~+E <br />`7 co,~ comp~nr <br />Seneca Coal Com <br />RECEIVED <br />April 5, 2002 <br />APR 10 2002 <br />Division of Minerals & Geology <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpoad Inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the first quarter stockpond inspections for those structures at <br />Seneca II-W which have been constructed to date. Inspections for Stockponds T-1, T-2, <br />T-3, T-18, T-22 and T-24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~_ <br />Roy A. Karo <br />Safety and Reclamation Manager <br />Enclosure(s) <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81839 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />