Laserfiche WebLink
• TABLE 15-8 <br />Ground Water Monitoring Frequencies <br />Yoast Mine <br />(Continued) <br />Site Name Water Levels Water Quality <br />YTM32 (Shop Well)B1 - Annual <br />- Indicates no monitoring <br />- Annual: July/August <br />Triannual: May/June, July/August, September/October <br />Semiannual: May/June, September/October <br />Water samples will be analyzed according to the ground water parameter list as given in <br />Table 15-4, Ground Water Parameter List, Yoast Mine. <br />• '"'Well In Mining area. Well will be mined out at some point in time. <br />e1Contingent upon SCC's decision to put this well into service. <br />• Indicates a deletion in text. <br />• <br />23 Revised 06101 <br />