Laserfiche WebLink
<br />1/ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />May 09, 2005 <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project / <br />CMLRB Permit No. M-88-112 / <br />Apri12005 Monthly Report <br />Dear Mr. Waldron: <br />,~~r~~~ <br />MAY 12 2005 <br />Yllslnion of hfincrals & &eolopy <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of April 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing lysimeters was verified on April 2T", no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />Apri127t6, the West Pit and tailings embankment monitoring wells were collected on April <br />28`". The April 2T° tailing impoundment piezometer measurements identified these installations <br />were either dry or contained less than 12 inches of water as illustrated in Table 2, Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on April <br />2Ts. The April tailings pond underdrain flow average was 33.93 gpm and a total of 850 gallons of <br />water was excavated from the leak detection system yielding a monthly average of 31.48 gpad. <br />During April, the West Pit water treatment plant operated efficiently discharging a total of <br />8,152,700 gallons (25.02 acre-feet) of water to Rito Seco Creek and a total of ],040,800 gallons <br />(3.19 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for April was L IO" inches, with the largest accumulation occurring on <br />April 11'" (.44"). <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Pax (719) 379-0713 <br />