Laserfiche WebLink
Richard D. Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Gelches. Executive Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C. SHELTON, Dlreetor <br />T0: Ed Bischoff <br />~. <br />FROM : Joe Olive ~ 1 ~-~-~ <br />DATE: July 13, 98 <br />RE: Empire Energy Corporation, Utah Tract Revision, draft findings <br />document schedule <br />Empire submitted responses to the Division's adequacy review of the Utah Tract <br />revision on July 2. The deadline for a draft findings document has been set <br />for August 7, 1984. Sandy and I have proposed the following assignments for <br />those sections of the findings document that will need to be revised from the <br />September 2, 1983 and April 9, 1984 findings documents. <br />I. Legal, Financial and Compliance SE <br />V. Geology JO <br />VI. Hydrologic Balance JO <br />VIII. Probable Hydrologic Consequences and <br />Cumulative Hydrologic Impact Study JO <br />X. Vegetation SE <br />XIII. Operations Description JO <br />XVIII Bonding SE <br />XX. Subsidence JP <br />XXU. Computability with Anticipated Adjacent Operations SE <br />The transfer of permit must also occur before we can approve it. Sandy will <br />handle that process. <br />JO/baw <br />Doc. No. 2826 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />