My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72618
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:09 PM
Creation date
11/21/2007 12:21:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521206
IBM Index Class Name
Permit File
Doc Date
6/1/2005
Doc Name
Cost Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # <br />Date <br />User <br />X03 State :Colorado <br />06/01/2005 County:Gunnison <br />JRS Site :West Elk Mine <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2005-212-06 <br />Task description :Reg/acts Ll4ht-USe R08d5 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D8R Series II <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,600 BCY <br />8SU Horsepower: 310 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />$48.82 NA <br />$66.09 100 <br />$1.78 25 <br />$31.78 NA <br />$148.47 Total Fleet cosVhour : $148.47 <br />Swell Loose <br />factor : 1.250 volume : 7,000 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 125 feet <br />Unadjusted hourly production : 726.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (I <br />Average site altitude : 8, 800 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.35 <br />Source <br />Adjusted unit production : 255.19 LCY/hr <br />Adjusted fleet production : 255.19 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 27.43 Hours <br />Unit cost : $0.582 /LCY Total job cost : $4,073 <br />Permivjob# : C-1980-007 <br />Abbreviation :none <br />Filename :0007-X03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.