Laserfiche WebLink
CIRCES Cost Estimating Software <br />Date: Ol-Jun-2005 Permitorjob no.: C-1980-007 <br />User : JRS Abbreviation : none <br />Filename : 0007-000 <br />Agency or organization name :Colorado Division Of Minerals And Geol <br />Permit or job action :Notice of Intent X-2005-212-06 <br />NA <br />ASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />X01 -Plug and Seal Six Exploration Holes borehole 1 72.0 $23, 548 <br />X02 -Regrade Drill Pads dozer 1 24.4 $3, 636 <br />X03 -Regrade Light-Use Roads dozer 1 27.4 $4,073 <br />X04 -Replace Topsoil from Stockpile to Drill Pads dozer 1 10.61 $1,575 <br />X05 -Replace Topsoil from Stockpile to Light-Use Roads dozer 1 11.8 $1, 764 <br />X06 -Reseed Drill Pads revege 1 2.0 $3,328 <br />X07 -Reseed Light-Use Roads revege 1 2.31 $3,696 <br />'includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Site :West Elk Mine <br />State :Colorado <br />County :Gunnison <br />SUBTOTALS: 150.8 <br />TOTAL DIRECT COST' <br />Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : 75.40 hrs'...$/hr $37.50 total = <br />Profit : 10.00 % of direct total = <br />$841 <br />$437 <br />$2, 827 <br />$4.162 <br />'assume net hours = 50% o/task hours TOTAL O 8 P = $8, 267 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $49,887 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contracUbid preparation : 4.25 %ofcntr. NA total = $2,120 <br />Reclamation management and/or administration : 3.25 %ofcntr NA total = $1,621 <br />CONTINGENCY- NA" NA total = NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST= $12,009 <br />TOTAL BOND AMOUNT (direct + indirect) _ $53,629 <br />