Laserfiche WebLink
SENECA II-W <br /> LIST OF EXHIBITS <br /> (Continued) <br /> Rule No.} Exhibit No. Title Volume <br /> <br /> 2.05.3(3) 13-27.72 Stock Tank T-2 (As-Built) 10 <br /> (Continued) 13.27.73 Stock Tank T-3 (As-Built) 10 <br /> 13.27.75 Stock Tank T-5 (As-Built) 10 <br /> 13-27.718 Stock Tank T-18 (As-Built) 10 <br /> 13-27.720 Stock Tank T-20 (As-Built) 10 <br /> 13-27.722 Stock lank T-22 (As-Built) 10 <br /> 13.27.724 Stock Tank T-24 (As-Built) 10 <br /> 13-27.725 Stock Tank T-ZS Design 10 <br /> 13-27.726 Stock Tank T-26 Design 10 <br /> 13.27.727 Stock Tank T-27 Design 10 <br /> 2.05.6.3 16-1 Water Rights 11 <br /> 2.06.8 16-2 Alluvial Deposits Along Dry Creek, Sage <br /> Creek, and Grassy Creek, Sheets 1 and 2 of 2 11 <br /> 16-3 Land Use, Flood Irrigated, and Subirrigated <br /> Areas Along Dry Creek, Sage Creek, and <br /> Grassy Creek, Sheets 1 and 2 of 2 11 <br /> 16-3 Map 1, Vegetation of Dry Creek ("AVF") Parcels 11 <br /> 16-3A Alluvial Valley Floor 11 <br /> 2.05.6.3 17-1 Mining Induced Drawdowns in the Overburden <br /> and Wadge Coai Aquifers 12 <br /> 17-1A Mining Induced Drawdowns in the Seneca <br /> II-W South Area 12 <br /> 17-2 SEDIMOT II Watershed Boundaries 005 and 006 <br /> Gulch Watersheds 12 <br /> 17-3 SEDIMOT II Watershed Boundaries 005 and 006 <br /> Gulch Watersheds Postmining 12 <br /> 17-4 Flow Net Analysis Wadge Overburden Aquifer 12 <br /> 2.05.4 19-1 Backfifling and Grading Plan 12 <br /> 19-1A Eliminated <br /> 20-1 Eliminated <br /> 20-1A Eliminated <br />. 20-2 Postmining Topography and Drainage 13 <br /> 20-2A Eliminated 13 <br /> PR-O5 5 Revised 01/06 <br />