Laserfiche WebLink
SENECA II-W <br /> LIST OF EXHIBITS <br />(Continued) <br /> <br /> Rule No.~ Exhibit No. Title Volume <br /> <br /> 12-3 Eliminated <br /> 12-3A Eliminated <br /> 12-3B Eliminated <br /> 2.05.3(3) 13-1 Facilities Map 8A <br /> 2.D5.3(4) 13-2 Surface Hydrology 8A <br /> 13-2A Eliminated <br /> 13-3 Surface Water Control Plan Tie-Across Haul Road SA <br /> 13-4 Watershed Boundary (Partial) 8A <br /> 13-5 Proposed Pond 005 8A <br /> 13-SA Pond 005 As-Built SA <br /> 13-6 Pond 006 Phase II As-Built 8A <br /> 13-6A Pond 006 Phase IV Subwatershed Map 8A <br /> 13-68 Pond 006 Phase IV Design 8A <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design SA <br /> 13-6D Pond 006 Phase V Subwatershed Map 8A <br /> 13-6E Pond 006 Phase V As-Built SA <br /> 13-7 Proposed Sedimentation Pond 009 8A <br /> 13-7A Sedimentation Pond 009 As-Built 8A <br /> 13-8 Pond 015 Design & Watershed Map, Sheets 1 and 2 of 2 9 <br /> 13-SA Pond 016 Design.8 Watershed Map, Sheets 1 and 2 of 2 9 <br /> 13-86 Pond 017 Design & Watershed Map, Sheets 1 and 2 of 2 9 <br /> 13-8C Pond 016 & 016A Watershed Boundary 9 <br /> 13-SPP Topsoil Stockpile PP Sumps PP-S1 and PP-S2 (As-Built) 9 <br /> 13-8QQ Topsoil Stockpile QQ Sump QQ-S1 (As-Built) 9 <br /> 13-SRR Topsoil Stockpile RR Sump RR-S7 (As-Built) 9 <br /> 13-9 Pond 015 As-Built 9 <br /> 13-9A Pond 16 As-Built 9 <br /> 13-9B Pond 016 Design Revision 9 <br /> 13-9C Pond 016A As-Built (Survey Date 8105/03) 9 <br /> 13-9D Pond 17 As-Built 9 <br /> 2.05.3(3) 13-10 Typical Road Details 9 <br /> 13-11.1 TAHR (As-Built) 9 <br /> 13-11.2 TAHR (As-Built) 9 <br /> 13-11.3 TAHR (As-Built) 9 <br />PR-05 3 Revised 01/06 <br />