Laserfiche WebLink
<br />!J <br />KREMMLING AIRPORT GRAVEL PIT <br />EXEEIBIT "B" <br />MINING PLAN <br />This operation has not been active since 1972. The remaining <br />0.68 acres will be mined in one operation in the future at a <br />date which has not yet been determined. <br />It is expected that equipment will consist of one crusher with <br />a capacity of 180 tons per hour, no more than two front end loaders <br />or caterpillars and trucks numbering no more than eight per day. <br />Extraction will proceed from the northern edge to the perimeter <br />of the permitted area. <br /> <br />