Laserfiche WebLink
.... <br />cL}'1~rs.Y <br />14. Presunr. land use Sand and gravel open pit T <br />(1. e., agricultural, industrial, etc.) <br />mininn l1DPratiOn <br />15. Y-:ropos+,d future land use T~J$~~e d~ s~pesal-€er-Ercra=' ir <br />(Goal of reclamation) Timber Co. <br />INSTRUCTIONS: This application form must be submitted in duplicate and each form must <br />be accompanied by tt~e following information and items. The application <br />trill not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />E\"HIEIT A - Legal Descrinti.on <br />The legal description must identify the .affected land and be wholly adequate for <br />field location of t}re property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter secticn. Flhere applicable, the street address or lot <br />number(s) may be used. <br />EXHZnIT b - 2•inine Plan <br />This can be a general discussion of the methods, equipment, phase^, or stages of <br />the operation and those portico of land affected by each. The plan should be <br />closely correlated with the man and should show where extraction will begin, which <br />direction it will proceed. <br />E%EI3IT C - `zn <br />This map shculd be as coeprehensive as possible is *_er._s of clearla defi:.in5 <br />the peryit boundaries and indicating all toads or stoci:pile areas to be u5?'S in <br />connection Brit?-: the operation. All imvrediately adjacent landowners roust be shown. <br />The closest quartet section corner, section line, er an}• other locatzsel^ point <br />should also be shoran on the >iao. <br />E}UiIEIT D - Wildlife, ?Water Resources. Veeetaticn and Soils Infor-z-tien <br />Each of the above-mentioned subjects must be addrAssed as outlined in the <br />applicable Rule, under ite~: number ten (10). <br />EYHISIT E - Recl.aratior. ?lam <br />As with the minim, plan, this should be a general discussion of the met}reds, <br />equipment, phases or stages of the recta^..atior. process and those porCiens of <br />land affected by each. if possible, the plan should be closely correlated <br />vit}r the sap. If not, the narrative must be coWprehensive enough to drat: an <br />accurate verbal picture of toe expect ad physical appeara,-.ce of the area after <br />completion of recia~.ation. <br />EYHIBIT c - Prcof of Local Government Aaoroval <br />This rust be a letter from the local goverrraer.t specifying conformance with <br />existing zoning regulations. <br />EX}iIRIT G - Source of Leal °ucht to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tai: <br />receipt. In lieu thcraof, a statement acS-r.owled~ed by a notary public that <br />the operator has tare 2ega1 risht to enter and mine will be accepted. <br />**FOT. Si "CIAL 10-D:.Y PE°`lITS 0`;LY** <br />E1RlIRIT }I - ?:ec].ar..atiort Costs <br />If the surety is requested to be less than $2500, the oncrntor must subr,it <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />E)C}II}lIT' I - 1'cr::rs of Govcrnmuntal Contract <br />~, <br />~; <br />l'C <br />i <br />~i <br />iY. <br />The operator musC submit a copy of rye contract or other proof that pruveu ~h.: <br />nece3si.Cy of a ::pncial 10-d.ty permit. 'l'ire apr.rator must also submit cvidcucu <br />of the. uurcty pr'ov1~ICd under thu governmental. contract, it it was requirud. <br />