Laserfiche WebLink
<br />HAYDEN GULCH TERMINAL, INC. <br />Hayden Gulch Loadout Facility <br />Permit No. C-92-OSl <br />Quarterly Sedimentarion Pond Inspection Report <br />Date of Inspection: October 8, 1999 Date last Inspected: June 17, 1999 <br />Pond: RaJ Loop Pond (0024) Pond Locatiom SHl/dSE1/4Scc.14T6NR88\\t <br />NPUES ID No.: COG-850008-002A Srte Location: 2 mi. SE of Havdeu, CO <br />Faciliry~ Contiguradon: Embankment Pond Owner's Rcp: Brian Dunfee <br />Water Level (above or below principal spillway): Above Below \ » Ft. <br />Sedvnent Level (below dewat ering orifice ~dcsignated sediment lever): >3 Ft. <br />Sediment Removal Required: 1~es No t <br />OutFlow: 0 cfs <br />FEATURE PROBLEM COMMENTS <br /> YES NO <br />EROSION <br />Rills & Gullies on Embankment S <br />Wave Erosion S <br />Spillway Erosion X <br />Burrows X <br />Other Jti <br />STRUCTURAL <br />Differential Settling S <br />Cracks or Sbdes S <br />Seepage <br />Other X <br />STRUCTURES <br />Prinapal Spillway t <br />Clogged Orifice S <br />Clogged nr Damaged Culvett X <br />Damaged Headgatc <br />Emergenty Spillway X <br />Erosion a <br />Riprap S <br />Clogged or Damaged Culvert <br />Other R <br />\lyntenance Required: Embankment needs to be re-seeded. \r'ill be re-seeded during ~m quarter once soil moisture <br />conditions improre. <br />\laintcnance Performed: None <br />Additional Commenn: No discharge observed during quarter. Pond was completely dn~ un day of inspection. No problems <br />with pond during quarter. <br />NA<`lE OP INSPf'_CTOR: Inhn C. \rreinman lOl2}I94 <br />``~~.~"P~p REG/S <br />.~ <br />oQ •PSE •fE/~ <br />U :07 <br />`/v{ 314 <br />A <br />`~ <br />