My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE72543
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE72543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:06 PM
Creation date
11/21/2007 12:20:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003091
IBM Index Class Name
Permit File
Doc Date
10/29/2003
Doc Name
Application
From
Lafarge West Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mining Schedule <br />Mining is currently projected to occur at the rate of approximately .5 tons/yeaz. Based on <br />an estimated reserve of 1.5 million tons, mining will be completed in approximately three <br />years from the start of operations. Mining is currently projected to commence in the winter <br />of 2005. <br />The following is the approximate acreage and time for mining each phase: <br />Acres per Phase Time for Mining (years) <br />Phase I 14 1 <br />Phase II <br />30 <br />Total 44 3 <br />The following equipment and facilities will be utilized in this operation: <br />Conveyors (2250 ft) Dozer (1) Back Hoe (1) <br />Graders (1) Loaders (2) Scrapers (2) <br />Stacking Conveyors Portable'foilet (1) <br />In order to gain an understanding of the extent of the mining operation, it is helpful to <br />know the acres disturbed by different aspects of the mine. The point in time where the <br />mining disturbance could be at its maximum, during the end of Phase II, has been selected <br />to illustrate the various acres of disturbance: <br />A. Stripped overburden and topsoil in anticipation of mining 15 acres <br />B. Active mining area 15 acres <br />C. Topsoil stockpiles ]acre <br />D. Roads 1 acre <br />E. Backfilled with stockpile 7 acres <br />F. Seeded 6 acres <br />G. Reseeded for 20% non-germination 1 acres <br /> Maximum Total Disturbance: 46 acres <br />Surface Water Management <br />All mine areas will drain internally. Uncontrolled releases of surface water and sediment <br />from mining aeeas will not occur. Stormwater collected in the open pit will be managed in <br />accordance with Colorado/NPDES discharge permit requirements. Sediment generated <br />from localized stormwater runoff and surface drainage will be detained in the ponds <br />already existing at the previously permitted Cottonwood Pit. <br />Existing water rights at the existing Cottonwood site will be used for dust control <br />operations along the roads and stockpiles at Duckworth. It is estimated that 2500 gallons a <br />week will be required to limit dust emissions. The water will be supplied using a 2500- <br />gallon water truck. <br />Duckx•orth Pit <br />DMG l12 Permi[ <br />Page 8 of 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.